Description |
Year |
Client |
Grade Slab – Concrete with reinforcement Area - 6000 Sq. mt |
2004 |
Impala |
Installation of GRP (Glass Reinforced Plastics) Water Tank – 120000 Gallon Capacity |
2005 |
Cummins |
Build, Supply and Installation of Pump Room (GF)- Civil Works, Electrical Works, Fire Pump (2,500 GPM) with piping & other related works |
2005 |
Cummins |
Over Ground – Loading / Unloading Ramps with Electro-Hydraulic Dock Levller with with swing lift for trucks |
2006 |
Impala |
Racking works (6.0 mt.height) for industrial storage |
2006 |
Impala |
Electrical Works – LED Light Installation / Electrical Wiring Works & Accessories installation works |
2006 |
INL |
Electrical Works – Installation of LED Light /Hight bay lights |
2007 |
DOKA |
Interior works – External & internal paint works for vehicle work shop – 10000sq. mt
|
2008 |
Al-Tayer |
Interior works – Glass partition works for office area |
2009 |
Al-Tayer |
Turnkey Project – Civil works, interior works, electrical works |
2009 |
Abela |
Electrical works – Rerouting of armoured cables (Under ground) – Approx length – 350mt |
2010 |
Cummins |
Electrical works – LV Room power upgrade works – installation of panel & other works |
2010 |
Impala Terminals Middle East |
Electrical works – LV Light Installing / electrical wiring works & accessories installation works |
2010 |
Bridgestone |
Turnkey Project – Design works, civil works, interior works, paint work etc, |
2010 |
Al ibrahimi Restaurant |
Magazzini |
Giovanni |
Italy |
Magazzini |
Giovanni |
Italy |
Magazzini |
Giovanni |
Italy |
Magazzini |
Giovanni |
Italy |